Design-build

One team for design and construction.

Design and build under a single contract and a single point of accountability. Faster, smoother, and no finger-pointing when something does not line up.

Interior framing during the AESC hospital conversion

Framing at the AESC Animal Hospital, Springdale, AR. Delivered by Spire's principals before founding Spire.

Why design-build

One contract. One number to call.

When the people drawing the building are the people building it, the budget, the schedule and the drawings get checked against each other every week, not at the end.

Single accountability

One contract, one team, one number to call. When design and construction live under the same roof, there is no gap for problems, or blame, to fall into.

Faster to finish

Design, permitting and early procurement overlap instead of running end to end. You break ground sooner and hit your opening date with room to spare.

Cost certainty, earlier

We price as we design. Budgets get locked and value-engineered while changes are still cheap, on paper, not in the field.

Fewer change orders

Constructability is reviewed before drawings are final, so the surprises that drive change orders get caught before they cost you.

How it works

Four steps, one team.

Step 01

Concept & Budget

We sit down with your goals, site and number, and tell you straight whether they line up.

Step 02

Design + Pre-Construction, in Parallel

Architectural design and construction planning run together. Budget, schedule and constructability are checked continuously, not at the end.

Step 03

Fixed Scope / GMP

You get a clear, committed price before we build. No moving target.

Step 04

Build & Deliver

One accountable team builds it, with daily logs and progress photos the whole way.

Ready to build?

Plan it right from the start.

Free consultation, no obligation. You will talk to someone who has built what you are planning.

Book a Free Consultation or call (844) SPIRE-GC
Call NowBook Free